Floor should be done before the walls typically.
Projects get to be a real pia when HOs want to do things. They usually do them poorly and out of order causing more problems, labor and lost time for contractors. 
|
I have no contractor.... I mean I am the contractor!
A friend of mine owns a tile business, so he did the wall in his spare time. I had to work around his schedule.
The shower tiling looks great! I'll have to take some pictures when it's all done.
I started the floor, but didn't finish. I didn't get much time to work on it last night. Hopefully I can knock it out wed night!
|
|
|