March 16, 2010, 08:03 PM
|
#1
|
|
One of the Irregulars
Join Date: Jul 2009
Posts: 11
|
installing bamboo glue down, do i have to fill holes from tack strips first?
I was wondering about this. Is it really necessary? I have 3/4 pre-finished bamboo and going to do a glue down installation above grade. Going to use Bosticks MVP over the concrete, then glue w/ Bosticks Best.
I have pulled up the carpet and was wondering do i have to fill the holes from the nails in the tack strips just along the baseboard part. The holes are about 1 1/2 inch from the wall. I was going to use a portland based cement patch to fill em in before i rent a scarifier for the concrete to get it smooth and get up the old glue and then check for levelness.
does this sound about right?
|
|
|