Site Finished Floor - Time period before sanding



"Site Finished Floor - Time period before sanding," in the Hardwood and Laminates Q&A forum, begins: "I had the problem of the cracks in the middle of the pre-finished Braz Cherry floor and they decided to ..."


Reply
 
LinkBack Topic Tools
Old October 5, 2006, 11:43 AM   #1
KathyK
One of the Irregulars
charter member badge
 
Join Date: Aug 2006
Location: Michigan
Posts: 26

Site Finished Floor - Time period before sanding


I had the problem of the cracks in the middle of the pre-finished Braz Cherry floor and they decided to pull it up and replace it with a site finished 3/4" solid Braz Cherry floor (yeah for me!!). They are just finishing up nailing the floor.

My question is why is there a wait between the time the wood is nailed to the floor to the time it should be sanded and sealed? I copied the following out of the NOFMA Tech Serv Installation Manual and it seems that it relates to acclimation, but figured that if the RH/MC was appropriate, I did not understand why waiting a minimum of 1 week would change anything. I also could have an older version of the manual.
http://www.nofma.org/Portals/0/Publi...d%20Floors.pdf
"Finishing should proceed 1-3 weeks after installation is completed. Longer periods of exposure to job site conditions can result in future problems. Finishing immediately after installation does not allow the flooring adequate time to acclimate to its new environment."

BTW: Did I tell you guys how much I am glad you are here to provide your excellent insight? If not, I should have!!

KathyK is offline   Reply With Quote
Old October 6, 2006, 12:58 AM   #2
Jerry Thomas
TFP supporter badge
charter member badge
 
Join Date: May 2006
Posts: 2,939

Re: Site Finished Floor - Time period before sanding


Good for you Kathy, I am so pleased to hear that. I know enough about finishing to be slightly dangerous so I can't offer you any help there.

have a great day

Jerry Thomas is offline   Reply With Quote
Old October 7, 2006, 07:02 AM   #3
Flip
a Floor Pro
charter member badge
 
Join Date: May 2006
Posts: 50

Re: Site Finished Floor - Time period before sanding


Kathy, Acclimation is the function of the wood entering your shelter and assuming or adjusting to the temperature and moisture of the new surroundings. Much the same as if you came in from a cold rainstorm, you would become warm and dry. The warm and dry that you become is equal to that of the shelter, no more, no less. The wood flooring takes a predetermined time to throw off or take on the temperature and moisture of the surroundings depending on the amount of change required to be equal. The NOFMA paramiter is the time deemed enough to allow for the changes in most parts of the country, I'm sure.

Flip is offline   Reply With Quote
Old October 7, 2006, 07:45 AM   #4
KathyK
One of the Irregulars
charter member badge
 
Join Date: Aug 2006
Location: Michigan
Posts: 26

Re: Site Finished Floor - Time period before sanding


Thanks. This floor is looking great (compared to the problems I had before). They are doing the 1st sanding today and I am really excited to see the wood when they start putting down the finish.

KathyK is offline   Reply With Quote
Reply


Go Back   The Floor Pro Community » Public Forums for the floor Pro, Do-It-Yourselfer & Consumer » Hardwood and Laminates Q&A
go to previous or next topic in this forum
« Cracks in middle of Brazilian Cherry floor | pics of BC Site Finished Floor »

Topic Tools


Similar Topics to Site Finished Floor - Time period before sanding
Topic Topic Starter Forum Replies Last Post
Actual time vrs Scheduled time Catch22 JustWood Flooring Potpourri 13 October 22, 2008 12:06 AM
Sanding maple jim Hardwood & Laminate Sales and Installations 4 October 7, 2008 07:15 AM
Pre-finished Milling Tolerances Unregistered Hardwood and Laminates Q&A 3 January 19, 2008 05:57 PM
I finished my beach cabin job Lo Down Taking a Break From Flooring 15 April 16, 2007 09:10 PM
pics of BC Site Finished Floor KathyK Hardwood and Laminates Q&A 11 October 13, 2006 03:12 AM

Log in
User Name:

Password:

Not a member yet?
Register Now!


All times are GMT -7. The time now is 11:04 AM.


Powered by vBulletin ©2000 - 2012, Jelsoft Enterprises Ltd.
SEO by vBSEO ©2011, Crawlability, Inc. | All Site Content ©2006-2012 TheFloorPro.com